Installation steps for SANY hydraulic cylinder seals
For Sany Cylinder Seal Kit,For Sany Swing Motor Seal Kit,Hydraulic Pump Seal Kit For Sany,Hydraulic Pump Seal Kit Sany Safe Seal Technology Co., Ltd. , https://www.jolseals.com
1. Preparation: Clean the working surface and seals, and check if the seals are damaged or deformed.
2. Apply lubricant: Apply a layer of lubricant to the seal and sealing groove.
3. Install the seal: Place the seal into the sealing groove, ensuring that the seal is fully embedded in the groove.
4. Install O-ring: Install the O-ring above the seal, ensuring that the O-ring is fully inserted into the groove.
5. Install the piston rod: Insert the piston rod into the seal and O-ring, ensuring that the piston rod fits tightly with the seal and O-ring.
6. Install the sealing sleeve: Place the sealing sleeve on the piston rod to ensure that it fits tightly with the piston rod.
7. Tighten the nut: Use the nut to fix the sealing sleeve on the hydraulic cylinder, ensuring that the sealing sleeve is secure.
8. Check the sealing effect: Operate the hydraulic cylinder and check if there is any leakage in the sealing element. If there is any leakage, reinstall the sealing element.
Recently, the Michelin Group embarked on a comprehensive upgrade of the Rato Technology Center near the headquarters in Clermont-Ferrand in order to increase Michelin's technological innovation and shorten the time to market for new products. As of 2017, a new ultra-modern building will house 3,300 R&D personnel in this technical center. While consolidating and consolidating Michelin's global R&D team and all laboratory resources, the upgrade of this technology center will also further optimize the process and increase work efficiency.
It is reported that the structural study of the integrated R&D building was started in early 2012 and will last for several months. The construction of the project in the first half of 2012 will take five years. The total investment of the project exceeds 100 million euros. The first phase of the project will be completed in 2014. By then, 600 R&D personnel will be able to settle in. The second phase of the project will be completed by the end of 2016 and it will accommodate 1,000 R&D personnel. By 2017, a brand new Michelin R&D complex will be formed in Latin America and build a high-level innovation and technology base for Michelin.