(1) The welding capacity of the glass steel absorber towers at the site is large, and the buildings and structures are densely distributed. The construction site is narrow. Construction workers must pay attention to safety. (2) During the construction of the desulfurization system of the entire FRP absorber, the absorption tower has the largest volume, the largest amount of steel, and the most difficult production. Facilities with high quality requirements and high technical content are the most critical equipment in the desulfurization system. . (3) The self-protection of the FRP absorber tower is difficult and it is difficult to construct the absorption tower on site. (4) Cross construction between civil construction and installation. To ensure construction progress and construction safety, the civil construction and installation shall be coordinated with each other during internal construction to ensure construction progress, quality and safety. We should do a good job in external coordination and communicate and cooperate with each other. (5) To ensure the installation quality of the FRP absorber tower. (6) Due to the location of the power plant, it is difficult to transport materials, and it will become an important factor affecting the processing of FRP absorber tower parts. Of course, the glass steel absorption tower steel structure production site and the installation site are separated by a long distance, and the parts will be affected by the road. And in the winter construction, welding quality assurance is difficult. High Precision Stamping Presses High Precision Stamping Presses,Precision High Speed Punch Machine,Precision Metal Stamping Presses,Precision Punch Press Stamping Machine Dongguan Samhoor Precision Machinery Co.,Ltd , https://www.samhoor-press.com