Beijing Aozhiqiang Electronic Technology Co., Ltd. is a high-quality on-camera detector manufacturer, an infrared on-shot detector manufacturer , a passive infrared detector manufacturer, a wireless infrared detector price , and an infrared detector brand. The company was established in 2000 and has always been an objective. Is: people-oriented, customer first. The business philosophy is: To recommend products that you really like.
Installation method
1 Pillar installation: The popular pillars are round and square. The more popular ones were round pillars. The current situation is exactly the opposite. Square pillars are becoming more and more popular in the engineering world. The main reason is that the detector is mounted on a square pillar without rotation and is not easy to move. In addition to this, there is a wide range of stainless steel, alloy, and aluminum alloy profiles to choose from. Another type of practice is to use angle steel as a pillar. If it is not guaranteed that the track can effectively penetrate the dark deposit and the line is exposed in the air, this method is not acceptable.
The shape of the pillars can be "1" shape, "Z" shape or curved, depending on the characteristics of the building and anti-theft requirements. The key point is that the fixing of the pillars must be firm and firm without shifting or shaking to facilitate installation and Fortifications, reduce false positives. ;

2 Wall-mounted installation: Currently, the leading manufacturers of active infrared detectors in the anti-theft market are able to provide infrared detectors with 180° omni-directional angles and pitch angles above 20°, such as ALEPH active infrared detectors HA, ABT, ABF series products can support the direct installation of probes on the outer walls or walls or fences of buildings.
Installation point
1. Lines must not be applied in a clear manner, and must be dark. This is the minimum requirement for the safety of the detectors.
2. The detector mounted on the wall shall have a maximum distance of 30 m from the edge of the wall along the wall. This requires special attention in places where the wall is curved and curved.
3. After the wiring is connected, use the resistance of the multimeter to test the power supply terminals 1 and 2 of the probe, and confirm that there is no short-circuit fault before turning on the power supply for debugging.

Pressure Control

Automatic Pressure Pump,Force Pressure Control,Pressure Control Switch,Automatic Pressure Control

Ningbo Metal Sharing Supply Chain Management Co., Ltd , https://www.metalsharing.com