1. Comprehensive management of equipment accidents, regardless of the cause, regardless of the size of the accident, including failures.
Second, the overall management of equipment accidents, not only the equipment management personnel to manage, but also the production operators must also manage, the violation of the command, the equipment, the management personnel have the right to stop the operation, the operator has the right to refuse.
Third, it is necessary to manage the whole process of the accident, organize accident repairs, conduct accident analysis, and formulate and supervise measures to prevent accidents. Propose the handling of accidents and submit them to relevant departments in a timely manner.
Fourth, the scope and classification of the accident.
Equipment that is officially put into production, in the production process, causing damage to equipment parts and components, causing sudden interruption of production, or sudden interruption of production due to the direct interruption of energy supply due to the equipment of the enterprise is called equipment accident.
1. Major equipment accidents, equipment accident loss (equipment repair cost plus production loss) of 50,000 yuan or more, or equipment repair cost of equipment accidents of more than 15,000 yuan; or major production equipment accidents make production The system is shut down for more than 16 hours.
2, general equipment accidents, equipment accident loss costs of more than 5,000 yuan, less than 50,000 yuan; or equipment repair costs of more than 1,000 yuan less than 15,000 yuan, or major production equipment equipment accidents caused production The system is shut down for more than 4 hours and less than 16 hours.
3, small equipment accidents, those who are insufficient for general equipment accidents are small equipment accidents.
4 equipment failure: In the production process, the equipment is not working properly, and the control failure is called equipment failure.
5. Any equipment accident must be reported to the Mobilization Department as required. After a major equipment accident, it must be reported to the Mobilization Department within two hours. The general accident must be reported to the Mobility Department (within 24 hours) after the equipment is restored. . Small equipment accidents and equipment failures report downtime to the Mobility Department before the 24th of each month.
6. The equipment is interrupted and the production is interrupted. It is usually interrupted once.
Accident time:
1. The time between the shutdown of the equipment and the recovery of production capacity of the equipment.
2. The equipment with the standby unit in the design, the time when the accident equipment is stopped and the standby equipment is turned on.
Equipment accident loss:
Including equipment repair and production loss. The repair fee includes replacement of materials, spare parts, labor and management fees. Loss of production loss = unit product profit * hour plan production * affect production time.
7. Those responsible for equipment accidents shall be punished according to their responsibilities.

Ground Rail Series

Ground Rail Series

The ground rail is a cast beam platform designed and spliced according to the fixed points of equipment, which is mainly used for the assembly, test, welding and inspection of large equipment. The ground rail can also be called T-channel ground rail, ground beam, ground channel iron, foundation channel iron, cast iron ground rail and strip platform. The ground rail produced by our company is made of high strength cast iron HT200-300, and the hardness of the working face is HB170-240. After two times of manual treatment (manual annealing of 600-700 degrees or natural aging of 2-3 years), the precision of the product is stable and the performance is good.


The main models of ground rails produced by our company are as follows:
Specification and model (long × wide × High)
1500×150×150 1500×200×150 1500×250×300 1500×300×400 2000×200×300 2000×250×300 2000×300×350 2000×350×350

2500×200×300 2500×250×300 2500×300×350 2500×300×400 2750×200×300 2750×250×300 2750×300×350 2750×300×400

3000×300×300 3000×300×350 3000×300×400 3000×320×400 3200×300×300 3200×300×350 3200×300×400 3200×320×400

3500×300×300 3500×300×350 3500×300×400 3500×320×400 4000×300×300 4000×300×350 3500×300×400 4000×320×400

4500×300×350 4500×300×400 4500×320×400 4500×350×400 5000×300×400 5000×350×400 5000×400×450

In addition, customers can also customize ground rails of different specifications according to their own needs!

Customize Professional Machine Tool Bed, High-end Bed Cast Iron,Gray Iron CNC Milling Machine Base

Baizhu Network Technology Co., Ltd. , https://www.baizhunet.com