Cement mixing tank anti-corrosion solution This project is cement tank tank station tank body outside due to long-term outside weather and natural environment weathering and appearance of the paint film detachment, and local rust phenomenon to carry out anti-corrosion construction. Preparation basis: 2.1 Party A Technical Requirements Documents 2.2 "Code for Construction and Acceptance of Anti-corrosion Engineering Pipelines for Industrial Equipment" HGJ229-91 2.3 "Corrosion grade and derusting grade of steel surface before painting" GB/T8923-88 2.4 "Measurement method for paint usage" GB1758-79 2.5 "Determination of coating thickness" GB1764-79 2.6 "Safety regulations for coating operations, safety of treatment processes prior to coating" GB1758-79 3.0 Preparation for construction organization: 3.1 On-site construction organization and labor arrangement plan: 3.1.1 On-site organization: Established the project manager of oil tank anti-corrosion project, assigned the company's experienced deputy manager as the project manager, responsible for the overall work of the project; 3.1.2 Delegate an engineer, two technicians, responsible for the technical work of the project; 3.1.3 Appoint a quality inspector to take charge of the safety work during construction; 3.1.4 assign a safety officer to take charge of the safety work during construction; 3.1.5 Labor Supply Plan: Cement mixing tank anti-corrosion solution